We have appointed a contractor to remove the entire perimeter road in the Cemetery extension area (Oxford Burial Ground) and replace with new.
These works are essential as the existing surface was becoming unsafe.
Every effort will be made to keep disruption to a minimum during the length of the project which is estimated to be 4 weeks from today.